Bridge Air-clearance Planner
Compare mast height and bridge clearance as water level changes. Explore a live diagram, follow the step-by-step instructions, save a scenario and download your results.
Start planning ↓Check the space above your mast
Compare an overhead structure’s published clearance with water level, your boat’s full air draft and your chosen allowance.
- Read the bridge clearance datum and span notes. Establish the expected water level relative to that exact reference.
- Measure air draft from the loaded waterline to the highest fitting, including antennas.
- Set your allowance and vary water level. A negative surplus means your chosen target is not met.
Positive means water above the bridge clearance datum; negative means below. This is not automatically the chart tide height.
Further reading: Canadian Hydrographic Service: vertical datums
- Available height
- 19 m
- Gap above highest fitting
- 2 m
- Surplus after allowance
- 1 m
- Maximum water offset for target
- 2 m
Check current charts, notices, the correct span, gauges and the bridge operator. Tide and bridge clearances can use different datums. Motion, surge, uncertainty and local restrictions still apply. Do not infer permission to pass or use this for overhead power-line safety.
Example values are starting points. Replace them with your own figures. Saving is optional and stays on this device.
Planning aid only. Not for navigation. Check every result against official charts, tide predictions and forecasts, current conditions and your vessel’s requirements before acting on it.
How it works
Subtract water level above the bridge clearance reference from published clearance, then subtract full air draft and your chosen allowance.
Surplus = published clearance − water offset − air draft − allowance
Worked example
A 20 m published clearance with water 1 m above its reference leaves 19 m. A 17 m air draft and 1 m allowance leave 1 m surplus.
Bridge clearance and chart tide datums may differ. Verify the span, reference level and current local information.
Continue planning
Under-keel Clearance Planner →
Visualise charted depth, tide and loaded draft against your chosen clearance allowance.
Departure Checklist Builder →
Create a trip-specific checklist, add your own checks and track completion.
Multi-leg Passage Planner →
Build a route timetable with individual leg speeds, stopovers and UTC arrivals.
