Stage 1: Marina to Hastings River entrance
Prepare the yacht for open water before reaching the bar:
- lifejackets on before the legal wear point;
- anchor secured;
- tender secured for sea;
- hatches and loose equipment secured;
- sails ready to deploy;
- engine checked and tested under load;
- VHF working;
- navigation route verified;
- crew positions assigned; and
- abort conditions agreed.
Follow the current marked river channel. The direct bearing from P01 to P02 is not a river route.
Stage 2: Hastings bar to P03
Observe several wave sets from a safe position. Identify the current variable leads and navigation marks. Confirm there is no conflicting traffic.
Once committed, maintain control and avoid unnecessary course changes in critical water. Continue offshore until the vessel is clear of bar effects, breaking banks and the commitment zone.
At P03 or the independently selected safe offshore gate:
- check steering;
- inspect the bilge;
- check engine instruments and charging;
- confirm no gear shifted;
- compare actual wind and swell with forecast;
- calculate the first revised ETA; and
- decide whether continuing north is still sensible.
Stage 3: P03 to Point Plomer
The coast north of Port Macquarie includes North Shore Beach, Queens Head and Point Plomer. Maintain deliberate offing from nearshore reefs and rocks.
Do not cut toward the beach because the chartplotter shows a shorter line. Consider:
- swell breaking farther offshore than expected;
- fishing vessels and gear;
- south-setting current;
- lee-shore exposure; and
- room to turn east if propulsion or steering fails.
Stage 4: Point Plomer to Crescent Head
The coast includes Big Hill Point, Delicate Nobby, Racecourse Head, Green Island near the coast and Crescent Head landmarks. These should not be confused with Green Island near South West Rocks later in the route.
At P05:
- compare actual time with plan;
- calculate required speed to the anchoring deadline;
- review crew condition;
- confirm fuel and engine status;
- receive any new warnings; and
- decide whether the route still has sufficient daylight margin.
Crescent Head is not a dependable harbour refuge.
Stage 5: Crescent Head to Hat Head
This is the longest leg in the planning table. Keep a disciplined watch and record position and progress at regular intervals.
Hazards and workload include:
- fatigue after the early departure;
- gradual loss of speed in adverse current;
- afternoon north-easterly development;
- whale activity in season;
- fishing gear;
- nearshore surf; and
- the temptation to reduce offing to regain time.
Hat Head and Korogoro Point are prominent, but Korogoro Creek is not a seagoing refuge. The official map notes that its entrance is shallow and should be navigated with caution.
Stage 6: Hat Head to Smoky Cape
Smoky Cape is a major high headland. The lighthouse is conspicuous and has a published characteristic, but identification must be made from current chart and light information.
Expect possible:
- wind acceleration;
- wave refraction;
- stronger current;
- rougher water near the cape;
- dive and fishing traffic; and
- bomboras or breaking hazards away from the obvious shoreline.
Move offshore before the Fish Rock complex. Do not wait until the rock is abeam to create clearance.
Stage 7: Fish Rock and Green Island
Fish Rock is one of Australia's best-known dive sites. Green Island and the surrounding water also attract dive operations.
Controls:
- maintain a dedicated visual lookout;
- recognise the International Code Flag A used by diving vessels;
- pass at a safe speed and distance;
- expect divers, shot lines and support vessels;
- do not pass between boats and their dive sites;
- allow for current setting the yacht toward the rocks;
- verify the current Grey Nurse Shark critical-habitat and fishing-closure rules; and
- do not use bait line fishing within the Fish Rock or Green Island critical habitat. The current official closure applies all year and covers bait whether alive or dead, subject to the detailed exceptions and definitions on the official page.
P07, P08 and P09 create an offshore route around the area. The safe clearance must be confirmed on the current chart and adjusted for conditions.
Stage 8: Turn toward Trial Bay
From P09, approach P10 north-east of Laggers Point rather than aiming directly for the beach or anchorage.
Before turning west:
- verify that Trial Bay remains suitable;
- identify Laggers Point and the Gaol precinct;
- confirm wind and swell have not shifted;
- check for dive, fishing and recreational traffic;
- identify the prohibited swimming area;
- review charted depths and hazards;
- prepare the anchor and windlass; and
- establish an escape route back to open water.
Stage 9: Inspect and anchor
Slow early. Use visual observation, current chart, depth sounder and a full circle of spatial awareness.
Select a position that provides:
- adequate depth at the next low water;
- suitable holding ground;
- enough swinging room for the full wind and tide range;
- clearance from beach, wrecks, reefs, breakwater remains and other vessels;
- clearance from swimming and restricted areas;
- an unobstructed route to sea; and
- acceptable protection for the entire planned stay.
Anchor procedure:
1. stop the vessel over the selected drop point; 2. lower, do not throw, the anchor; 3. pay out cable while moving astern under control; 4. use scope appropriate to depth, freeboard, forecast and room; 5. set the anchor progressively; 6. take transits and verify GPS position; 7. set anchor and depth alarms; 8. observe the boat through several gusts and swings; 9. maintain an anchor watch suitable to conditions; and 10. prepare to leave if the protection changes.
Stage 10: Optional Macleay River assessment
Do not move directly from anchoring into a casual river attempt.
If river entry is still intended:
- contact Marine Rescue Trial Bay;
- obtain expert local knowledge;
- inspect official South West Rocks and river webcams;
- check current notices;
- identify the present channel without using decommissioned leads;
- assess tide, river flow, swell, wind and daylight;
- wear required lifejackets;
- test propulsion under load;
- establish abort points; and
- cancel if any part is uncertain.
---